Progressive Cavity Pump Gas Anchor for Oilfield

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
61
Year of Establishment
2001-04-16
  • Progressive Cavity Pump Gas Anchor for Oilfield
  • Progressive Cavity Pump Gas Anchor for Oilfield
  • Progressive Cavity Pump Gas Anchor for Oilfield
  • Progressive Cavity Pump Gas Anchor for Oilfield
  • Progressive Cavity Pump Gas Anchor for Oilfield
Find Similar Products

Basic Info.

Model NO.
5-1/2"-9-5/8"
Manufacturing Process
CNC Milling
Material
Alloy
Add
No.37qilianshan Road.
Transport Package
as Export Standard
Specification
5-1/2"-9-5/8"
Trademark
ZX
Origin
China, Shandong, Dongying
Production Capacity
50, 000, 00 Pieces /Year

Product Description

Product Description:

 

The Gas Separator separates free gas from fluid prior to entering pumps and helps avoid costly pump damage.

 

The Gas Separator was designed to provide a method of allowing gas to separate out of the solution and migrate up the annulus, preventing gas locking of the down-hole pump. They use centrifugal forces to separate the gas from the produced liquids, before they enter the pump. Liquids will be carried through into the pump suction while the separated gases are forced to migrate up the annulus. Using the tool allows gas-free production fluids to be carried into the pump station while the separated gases are forced to migrate up the annulus. 

 

The Beam Gas Down-Hole Separator pump increases efficiency and production.

 

Technical Parameters

model

 Max diameter

in  adaptable casing size

Connection size

LZX  100

101.1

51/2''

2-7/8"

LZX  114

114

7''

3-1/2"

LZX  244.8

244.8

9-5/8"

4-1/2"



Product Picture:
Progressive Cavity Pump Gas Anchor for Oilfield

Progressive Cavity Pump Gas Anchor for OilfieldProgressive Cavity Pump Gas Anchor for Oilfield
Company information:
Progressive Cavity Pump Gas Anchor for OilfieldProgressive Cavity Pump Gas Anchor for Oilfield

Our Services:

 For more information, you can contact me :

    Contact person : Alisa Ma

 

 

Looking forward to cooperating with you!

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier