After-sales Service: | After Sale Service |
---|---|
Warranty: | 6 Months |
Manufacturing Process: | CNC Milling |
Surface Treatment: | Phosphating |
Operation Pressure: | Atmospheric Pressure |
Material: | Alloy |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Casing OD
|
TUBING CENTRALIZER (ID) |
TUBING CENTRALIZER (OD) |
5 1/2"
|
2-3/8"(60.325mm)
|
110mm
|
7" 6"
|
2-3/8"(60.325mm)
|
140mm
|
7" 6"
|
2-7/8"(73.025mm)
|
140mm
|
2-7/8"(73.025mm)
|
114-115mm
|
|
7"
|
3-1/2"(88.900mm)
|
140mm
|
0.83"(210.82mm)
|
419.1mm
|
|
|
1.19"(302.26mm)
|
419.1mm
|
Suppliers with verified business licenses